CAMPAIGN LINK HANDOFF — HAND-READING NOTES All clients, owners, placements, labels, decisions and URLs are fictional. Every destination is example.com. No HTTP request, click, email/post, URL shortener, redirect or Google Analytics connection was made. 1. Read the BR01 agreement in the article. Kit owns the fictional campaign label studio_open_day and the four field values. The example checks those values only, not every relevant Analytics parameter or configuration. Source/medium choices are this team's labels, not a promise of default channel grouping. 2. Keep the Original destination cell unchanged. In this case lang=en%2DAU must remain that exact raw query; do not decode/re-encode it as lang=en-AU. Values are not lowercased automatically. 3. Separate query from fragment at #. Query pairs appear before #. Text such as utm_content=sidebar_text after # belongs to the fragment, not the query. The example does not establish that any anchor exists. 4. P01 has no query UTM values. Add the four agreed pairs after lang=en%2DAU and before #programme. Read the completed query back: fern_newsletter / email / studio_open_day / intro_button. Keep the existing query and fragment. 5. P02 already has exactly one of every agreed value, including content footer_text. Its proposed final URL equals its original character for character. Do not append another set. P01 and P02 go to the same example page but identify different agreed placements. 6. P03 contains utm_campaign=studio_preview, contrary to agreed studio_open_day. Leave Proposed final URL blank and ask Kit which destination/campaign applies. Do not overwrite the old value or add a second campaign key. 7. P04 has utm_campaign twice, even though the two values are identical. The BR01 contract holds duplicate keys rather than choosing the first/last or deleting one. Its utm_content text is after # and cannot count as the agreed query value. Ask Kit for the intended fragment and a single campaign query value. No corrected URL is asserted. 8. Compare component-readback.csv. P01/P02 read back proposed final URLs; P03/P04 read back retained originals because no final URL is prepared. Empty query content for P04 does not mean its fragment has been removed. 9. Hand over two compared rows and two held rows with their questions. Actual destination access, anchor/redirect behaviour, email-tool rewriting, permission to send and Analytics collection require their own authorised checks. This worksheet proves none of them. Files are plain UTF-8 BOM CSV values, not a URL-builder app, analytics integration or automatic approval. Spreadsheet/Office import has not been tested. Import a copy and check column boundaries and exact strings; do not let a formula or automatic link tool rewrite the original. The blank file has one empty data row. You can follow this case by reading without Python.